Note dated 1.11.20 (edited Aug 2026)
Over a year has gone by since my first warning of potential disaster.
Since December 2016, the rate of Climate Change continues to accelerate.
Shannon flood risk continues to increase and a 20% increase in flood flow over the Shannon catchment is a reasonable future risk assessment.
Yet our "head-in-the-sand" politics still gives lip-service to the problem, while refusing to make the fundamental changes long-required!
Nor is change likely to occur, until Administration of the Shannon Catchment Region undergoes radical reform. A Gender Balanced Unitary Authority with overriding administrative control, is the obvious solution.
Outline of the Problem


Shannonsuperhighway
Catastrophic Event Scenario

Shannonsuperhighway
Inadequate discharge capacity
Shannon Catchment Flooding Solution

Shannonsuperhighway
Floodwater Relief Dam Proposal

Shannonsuperhighway
1000 m3/sec floodwater release direct to Shannon Estuary

Shannonsuperhighway
Predicted 1 in 200 year Event - Area at Flood Risk shaded green
Storm Surge Flooding Solution

Shannonsuperhighway
Surge Tide Barrier - Protection against rising sea levels and exceptional Storm Tides